DR ALL-TERRAIN Service Manual Page 253

  • Download
  • Add to my manuals
  • Print
  • Page
    / 594
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 252
CONVERTER SYSTEM 6-25
Driven Pulley
Align the paint mark “0” [A] on the movable sheave [B]
with the point [C] on the fixed sheave [D] for phase fit of
the sheaves.
In that case the opening [A] and hole [B] will be matched
easily.
Apply grease (WR500-No.2 (KYODO YUSHI), POWER
LITE WR #2 (KYODO YUSHI), or SERAN-HV (TOTAL
FINA)) to the seating s urface [A] of t he pins, and insert
them into the holes in the movable sheave.
Draw the m ovable sheave onto the fixed sheave, and ap-
ply grease of 1 g (0.035 oz) to all openings [A].
Grease - WR500-No.2 (KYODO YUSHI) or
POWERLITEWR#2(KYODOYUSHI)or
SERAN-HV (TOTAL FINA)
NOTE
Do not heap up the grease out of the openings.
Check that the O-rings [A] are in good condition.
If any of the O-rings are damaged, replace them.
Apply grease to the O-rings.
Page view 252
1 2 ... 248 249 250 251 252 253 254 255 256 257 258 ... 593 594

Comments to this Manuals

No comments